Attractions

Calibration is required in the process of controlling our equipment if we are to ensure the traceability of measurements.

With the help of etalon weights we verify the accuracy of our indication, eccentricity and repetability.
Pressure equipment
FIRED OR OTHERWISE HEATED PRESSURE EQUIPMENT
| Fired or otherwise heated pressure equipment | Steam generators | |
| Steam sterilizers - autocalves |
DETAILED SCOPE OF ACCREDITATION
| No. | Inspection field (product, product design, service, process, plant) | Inspection type | Methods and procedures, normative documents | Notes |
| 15. | Fired or otherwise heated pressure equipment with risk of overheating: -steam generators - steam sterilizers* -autoclaves* * directly heated sterilizers or autoclaves | -inspection before use (initial inspection) -subsequent inspection (periodic) during use (external examination, internal examination, pressure test) -extraordinary inspection | Rules on examination and testing ofpressure equipment (Official Gazette of the RS, No. 92/08, Article 17) | Inspection of fired equipment for Groups 1 and 2 of Annex I of the National regulation. Inspection only on place of instrument use. |
PRESSURE VESSELS
| Pressure vessels | Simple pressure vessels | ![]() |
| Pressure vessels for hot water and steam | ||
| Heat exchangers | ||
| Pressure vessels for technical gases |
DETAILED SCOPE OF ACCREDITATION
| No. | Inspection field (product, product design, service, process, plant) | Inspection type | Methods and procedures, normative documents | Notes |
| 16. | Pressure vessels: -simple pressure vessels, -for air and nitrogen, - for hot water and steam, - heat exchangers, -steam sterilizers*, -autoclaves* * indirectly heated sterilizer or autoclave | -inspection before use (initial inspection) -subsequent inspection (periodic) during use (external examination, internal examination, pressure test) -extraordinary inspection | Rules on examination and testing ofpressure equipment (Official Gazette of the RS, No. 92/08, Article 17) | Inspection of pressure vessels for Groups 4 and 5 of Annex I of the National regulation. Inspection only on place of instrument use. |
PIPELINES
| Pipelines | Pipelines for technical gases | ![]() |
| Pipelines for hot water and steam | ||
| Hot water remotely heating |
DETAILED SCOPE OF ACCREDITATION
| No. | Inspection field (product, product design, service, process, plant) | Inspection type | Methods and procedures, normative documents | Notes |
| 17. | Pipelines -for hot water and steam -for heating systems with water Pipelines -for hot water and steam -for heating systems with water -for compressed air | -inspection before use (initial inspection) -subsequentinspection (periodic) during use (extemal examination, pressure test) -extraordinary inspection | Rules on examination and testing of pressure equipment (Official Gazette of the RS, No. 92/08, Article 17) | Inspection ofpipelines for Group 9 of Annex I of the National regulation. Inspection only on place of instrument use. |
PROTECTIVE EQUIPMENT
| Protective equipment | Safety valves | ![]() |
| Manometers | ||
| Level meters |
DETAILED SCOPE OF ACCREDITATION
| No. | Inspection field (product, product design, service, process, plant) | Inspection type | Methods and procedures, normative documents | Notes |
| 18. | Protection equipment: - safety valves | - inspection of adjustment and functionality | Intemal procedure ML10N80, issue 3 | Inspection is petformed for safety valves which form part of pressure equipment specified in items 15th, 16th and 17th of this table. Inspection only on place of instrument use. |